https://bugs.kde.org/show_bug.cgi?id=279445 Summary: Change the way progress is reported in the Geolocation
Correlator
Product: digikam
Version: 2.0.0
Platform: Unlisted Binaries
OS/Version: Linux
Status: UNCONFIRMED
Severity: wishlist
Priority: NOR
Component: Usability
AssignedTo:
[hidden email]
ReportedBy:
[hidden email]
Version: 2.0.0
OS: Linux
When applying coordinates to images using the Geolocation Correlator, the user
is informed of the progression because the list of images in the dialog scrolls
from top to bottom.
It would be better to have a progress bar.
Reproducible: Always
Steps to Reproduce:
Use correlator to georeference a list of images
Actual Results:
User knows of the progression because the list of images scrolls from top to
bottom
Expected Results:
The dialog should have a progress bar from 0 to 100%
--
Configure bugmail:
https://bugs.kde.org/userprefs.cgi?tab=email------- You are receiving this mail because: -------
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel