[digikam] [Bug 326495] New: Calendar: higher flexibility in the layout

classic Classic list List threaded Threaded
6 messages Options
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] New: Calendar: higher flexibility in the layout

drch
https://bugs.kde.org/show_bug.cgi?id=326495

            Bug ID: 326495
           Summary: Calendar: higher flexibility in the layout
    Classification: Unclassified
           Product: digikam
           Version: 3.5.0
          Platform: openSUSE RPMs
                OS: Linux
            Status: UNCONFIRMED
          Severity: wishlist
          Priority: NOR
         Component: Dates
          Assignee: [hidden email]
          Reporter: [hidden email]

Description:
Currently, the layout of the calendar is fix: years and month as hierarchy,
week and day as  "data sheet".

Request:
there should be an additional, 3rd hierarchy level showing the days in the
calendar view (probably with weekday)

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] Calendar: higher flexibility in the layout

Gilles Caulier-4
https://bugs.kde.org/show_bug.cgi?id=326495

Gilles Caulier <[hidden email]> changed:

           What    |Removed                     |Added
----------------------------------------------------------------------------
             Status|UNCONFIRMED                 |RESOLVED
                 CC|                            |[hidden email]
         Resolution|---                         |INVALID

--- Comment #1 from Gilles Caulier <[hidden email]> ---
Month days are display just under date tree-view, as calendar... Click on a
single day or a multiple days selection will update icon-view accordingly.

Gilles Caulier

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] Calendar: higher flexibility in the layout

drch
In reply to this post by drch
https://bugs.kde.org/show_bug.cgi?id=326495

--- Comment #2 from bugs bunny <[hidden email]> ---
(In reply to comment #1)
> Month days are display just under date tree-view, as calendar... Click on a
> single day or a multiple days selection will update icon-view accordingly.
>
> Gilles Caulier

Maybe my request was not precisely formulated:
- currently, there is a fix 2-level hierarchy (e.g. 2010 / March 2010) as a
tree-view. Here, months can be expanded and collapsed -> fine
- the proposal is to add a 3rd level (e.g. 2010 / March 2010 / Th 18) - as a
tree view (!)
Remarks:
1. "March 2010" could be reduced to "March" (or: "03" only), because it is a
(visible) refinement of "2010"
2. the "standard date: "YYYY-MM-DD" could be displayed as a 3-level hierarchy,
e.g. "2010 / 03 / 18" (whereby both, month and days, could be
collapsed/expanded)

One more point:
I see a conceptual different between the calendar tree and the tree navigator.
The tree navigator has a single root, "my Albums". "My Albums" can be narrowed
by different "collections" (first level hierarchy, reflecting (different) file
system(s)) which again consist of sub-albums (reflecting the folder structure
of the collections).
Wouldn't it be consistent to use the same concept for calendars, i.e. "My
Calendars", "Collection Calendars" and "Albums Calendars". The calendars could
then be displayed using the standard tree navigator.
 The current calendar would then be the global "My Calendar", right?

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] Calendar: higher flexibility in the layout

drch
In reply to this post by drch
https://bugs.kde.org/show_bug.cgi?id=326495

bugs bunny <[hidden email]> changed:

           What    |Removed                     |Added
----------------------------------------------------------------------------
             Status|RESOLVED                    |UNCONFIRMED
         Resolution|INVALID                     |---

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] Calendar: higher flexibility in the layout

Gilles Caulier-4
In reply to this post by drch
https://bugs.kde.org/show_bug.cgi?id=326495

Gilles Caulier <[hidden email]> changed:

           What    |Removed                     |Added
----------------------------------------------------------------------------
             Status|UNCONFIRMED                 |RESOLVED
         Resolution|---                         |WONTFIX

--- Comment #3 from Gilles Caulier <[hidden email]> ---
I will be more clear... There is no plan to change layout and goal in calendar
view. As i said previously, calendar day already exists on bottom left of date
tree-view and is enough. No need to bloat tree-view with a large supplemental
day entries...

Gilles Caulier

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel
Reply | Threaded
Open this post in threaded view
|

[digikam] [Bug 326495] Calendar: higher flexibility in the layout

drch
In reply to this post by drch
https://bugs.kde.org/show_bug.cgi?id=326495

--- Comment #4 from bugs bunny <[hidden email]> ---
(In reply to comment #3)
> I will be more clear... There is no plan to change layout and goal in
> calendar view. As i said previously, calendar day already exists on bottom
> left of date tree-view and is enough. No need to bloat tree-view with a
> large supplemental day entries...
>
> Gilles Caulier

Fine, however, two  final remarks. Without this feature, digiKam falls back
behind:
- Lr, where the proposed 3-level presentation is displayed in the "metadata"
section and where data can be imported/copied in the YYYY-MM-DD format
- Ap, where data can be exported in YYY-MM-DD format and later be imported as
projects with a 3-level structure YYYY/MM/DD as folder/folder/project

In both programs, the usage of a 3-level hierarchy improves the usability a
lot.

--
You are receiving this mail because:
You are the assignee for the bug.
_______________________________________________
Digikam-devel mailing list
[hidden email]
https://mail.kde.org/mailman/listinfo/digikam-devel